One agency, forward view
45 Pipeline and Hazardous Materials Safety Administration rules take effect in the window
45 final rules from Pipeline and Hazardous Materials Safety Administration carrying an effective date in the forward window.
Final rules matching this cut of the record.
Taking effect inside the month.
Promulgating bodies represented here.
Distribution
When these rules bind
45 rules by month of effective date. Source: Federal Register API, read 3 September 2026.
The records
Every rule on this view
Soonest first. A red margin rule marks a rule binding today; a faint rule marks one binding within 30 days.
-
001
Hazardous Materials: Reducing Burdens on Domestic Aerosol Shippers
Prior state amending the Hazardous Materials Regulations by updating the definition of an aerosol to eliminate unnecessary regulatory burdens and maintain consistency with current international transportation standards.
binds today Federal Register → -
002
Hazardous Materials: Reducing Costs to Domestic Shippers and Carriers of Limited Quantities
Prior state Not stated in the source document.
binds today Federal Register → -
003
Hazardous Materials: Reducing Undue Paperwork Burdens to Domestic Carriers
Prior state Not stated in the source document.
binds today Federal Register → -
004
Hazardous Materials: Reducing Burdens by Allowing Continued Use of Department of Transportation Special Permit Packagings
Prior state Not stated in the source document.
binds today Federal Register → -
005
Hazardous Materials: Improving Efficiencies for Special Permits and Approvals Renewals
Prior state Not stated in the source document.
binds today Federal Register → -
006
Hazardous Materials: Modernizing Payments To and From America's Bank Account
Prior state Not stated in the source document.
binds today Federal Register → -
007
Hazardous Materials: Reducing Recordkeeping Requirements for Domestic Carriers
Prior state amends the hazardous materials program procedures to allow motor and vessel carriers to carry PHMSA registration documents in electronic form.
binds today Federal Register → -
008
Hazardous Materials: Reduce Training Burdens for America's Farmers
Prior state Not stated in the source document.
binds today Federal Register → -
009
Hazardous Materials: Removing Burdensome Rail Reporting Requirements
Prior state replacing various rail transportation requirements that are either obsolete, overly burdensome, or conflict with other requirements in the Hazardous Materials Regulations.
binds today Federal Register → -
010
Hazardous Materials: Adoption of Department of Transportation Special Permits 12412 and 11646 Into the Hazardous Materials Regulations
Prior state amending the Hazardous Materials Regulations to adopt the provisions of U.
binds today Federal Register → -
011
Hazardous Materials: Adoption of Department of Transportation Special Permit 21379
Prior state Not stated in the source document.
binds today Federal Register → -
012
Hazardous Materials: Adoption of Department of Transportation Special Permit 14175
Prior state Not stated in the source document.
binds today Federal Register → -
013
Hazardous Materials: Adoption of Department of Transportation Special Permit 21478
Prior state Not stated in the source document.
binds today Federal Register → -
014
Hazardous Materials: Reducing Burdens on Domestic Companies Using Battery-Powered Equipment in Trades
Prior state Not stated in the source document.
binds today Federal Register → -
015
Hazardous Materials: Allowing Fireworks Certification Agencies (FCAs) To Approve Professional Fireworks
Prior state amendments will streamline PHMSA's fireworks approval process and provide the industry with improved regulatory flexibility.
in 5 days Federal Register → -
016
Hazardous Materials: Remove Redundant List of U.S. EPA CERCLA Hazardous Substances
Prior state Not stated in the source document.
in 90 days Federal Register → -
017
Pipeline Safety: Standards Update-ASTM A333/A333M
Prior state Not stated in the source document.
in 120 days Federal Register → -
018
Pipeline Safety: Standards Update-ASTM F2620
Prior state amends PHMSA's regulations to incorporate by reference an updated edition of industry standard ASTM F2620, Standard Practice for Heat Fusion Joining of Polyethylene Pipe and Fittings.
in 120 days Federal Register → -
019
Pipeline Safety: Standards Update-ASTM D2513
Prior state amends PHMSA's regulations to incorporate by reference an updated edition of industry standard ASTM D2513, Standard Specification for Polyethylene (PE) Gas Pressure Pipe, Tubing, and Fittings.
in 120 days Federal Register → -
020
Pipeline Safety: Standards Update-ASTM F2767
Prior state Not stated in the source document.
in 120 days Federal Register → -
021
Pipeline Safety: Standards Update-ASTM F1973
Prior state Not stated in the source document.
in 120 days Federal Register → -
022
Pipeline Safety: Standards Update-ASTM F1055
Prior state Not stated in the source document.
in 120 days Federal Register → -
023
Pipeline Safety: Standards Update-MSS SP-75
Prior state amends PHMSA's regulations to incorporate by reference an updated edition of industry standard MSS SP-75, High- Strength, Wrought, Butt-Welding Fittings.
in 120 days Federal Register → -
024
Pipeline Safety: Standards Update-NACE SP0502
Prior state amends PHMSA's regulations to incorporate by reference an updated edition of industry standard NACE SP0502, Pipeline External Corrosion Direct Assessment Methodology.
in 120 days Federal Register → -
025
Pipeline Safety: Standards Update-NACE SP0206
Prior state amends PHMSA's regulations to incorporate by reference an updated edition of industry standard NACE SP0206, Internal Corrosion Direct Assessment Methodology for Pipelines Carrying Normally Dry Natural Gas (DG-ICDA).
in 120 days Federal Register → -
026
Pipeline Safety: Standards Update-ASME B31.4
Prior state amends PHMSA's regulations to incorporate by reference an updated edition of industry standard ASME B31.
in 120 days Federal Register → -
027
Pipeline Safety: Standards Update-ASTM A372/A372M
Prior state amends PHMSA's regulations to incorporate by reference an updated edition of industry standard ASTM A372/A372M, Standard Specification for Carbon and Alloy Steel Forgings for Thin- Walled Pressure Vessels.
in 120 days Federal Register → -
028
Pipeline Safety: Standards Update-ASTM D2564
Prior state amends PHMSA's regulations to incorporate by reference an updated edition of industry standard ASTM D2564, Standard Specification for Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Piping Systems.
in 120 days Federal Register → -
029
Pipeline Safety: Standards Update-NFPA 58
Prior state amends PHMSA's regulations to incorporate by reference an updated edition of industry standard NFPA 58, Liquefied Petroleum Gas Code.
in 120 days Federal Register → -
030
Pipeline Safety: Standards Update-ASTM A53/A53M
Prior state amends PHMSA's regulations to incorporate by reference an updated edition of industry standard ASTM A53/A53M, Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc- Coated, Welded and Seamless.
in 120 days Federal Register → -
031
Pipeline Safety: Standards Update-NFPA 59
Prior state amends PHMSA's regulations to incorporate by reference an updated edition of industry standard NFPA 59, Utility LP- Gas Plant Code.
in 120 days Federal Register → -
032
Pipeline Safety: Standards Update-ASTM D2564
Prior state amended PHMSA's regulations at 49 CFR part 192 to incorporate by reference the updated industry standard ASTM D2564, Standard Specification for Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Piping Systems.
in 120 days Federal Register → -
033
Pipeline Safety: Standards Update-ASTM F1973
Prior state Not stated in the source document.
in 120 days Federal Register → -
034
Pipeline Safety: Standards Update-NFPA 58
Prior state amended PHMSA's regulations at 49 CFR part 192 to incorporate by reference the updated industry standard NFPA 58, Liquefied Petroleum Gas Code (NFPA 58).
in 120 days Federal Register → -
035
Pipeline Safety: Standards Update-NFPA 59
Prior state amended PHMSA's regulations at 49 CFR part 192 to incorporate by reference the updated industry standard NFPA 59, Utility LP-Gas Plant Code (NFPA 59).
in 120 days Federal Register → -
036
Pipeline Safety: Standards Update-NACE SP0502
Prior state Not stated in the source document.
in 120 days Federal Register → -
037
Pipeline Safety: Standards Update-NACE SP0206
Prior state Not stated in the source document.
in 120 days Federal Register → -
038
Pipeline Safety: Standards Update-MSS SP-75
Prior state amended PHMSA's regulations at 49 CFR part 195 to incorporate by reference the updated industry standard MSS SP-75, High-Strength, Wrought, Butt-Welding Fittings.
in 120 days Federal Register → -
039
Pipeline Safety: Standards Update-ASTM F2620
Prior state amended PHMSA's regulations at 49 CFR part 192 to incorporate by reference the updated industry standard ASTM F2620, Standard Practice for Heat Fusion Joining of Polyethylene Pipe and Fittings.
in 120 days Federal Register → -
040
Pipeline Safety: Standards Update-ASTM F2767
Prior state Not stated in the source document.
in 120 days Federal Register → -
041
Pipeline Safety: Standards Update-ASTM D2513
Prior state amended PHMSA's regulations at 49 CFR part 192 to incorporate by reference the updated industry standard ASTM D2513, Standard Specification for Polyethylene (PE) Gas Pressure Pipe, Tubing, and Fittings.
in 120 days Federal Register → -
042
Pipeline Safety: Standards Update-ASTM F1055
Prior state Not stated in the source document.
in 120 days Federal Register → -
043
Pipeline Safety: Standards Update-ASTM A372/A372M
Prior state Not stated in the source document.
in 120 days Federal Register → -
044
Pipeline Safety: Standards Update-ASTM A333/A333M
Prior state Not stated in the source document.
in 120 days Federal Register → -
045
Pipeline Safety: Standards Update-ASTM A53/A53M
Prior state Not stated in the source document.
in 120 days Federal Register →
Cite this view
45 final rules from Pipeline and Hazardous Materials Safety Administration carrying an effective date in the forward window. Figures read 3 September 2026. Cite the read date with the figure: the window moves as rules are published and amended.
Pipeline and Hazardous Materials Safety Administration - rules by effective date - Luminory. Luminory federal effective-date record, 45 records, read 3 September 2026. https://luminory.org/agency/pipeline-and-hazardous-materials-safety-administration/Luminory. (2026). Pipeline and Hazardous Materials Safety Administration - rules by effective date - Luminory [Data set]. Derived from the U.S. Federal Register API. https://luminory.org/agency/pipeline-and-hazardous-materials-safety-administration/All citation formats · How this is derived · Raw data (CC BY 4.0)